All

Your present location:Home > FAQS

Feedback

FAX: +86 755 27622693
Email: info@evershining.cc
Factory Add 1:
6/F, New Century Industrial Park, Yingrenshi, Shiyan Town, Bao'an District, Shenzhen, China.
Factory Add 2
B Block, Hengling Industrial Zone, Minzhi Road, Longhua Street, Bao'an District, Shenzhen, China

Data processing

  • 详细介绍: Switching sequence (Synchronous system)(1)Starting up: turn on led screen first, start the computer, click the LED control panel, enter the display software, open the file, run the program. At last, turn on the dedicated control switch to provide power for screen.(2)Shutdown: turn off the dedicated control switch first , sign out the software and all programs ,turn off the computer ,shut down the screen at last.Precautions:1.Operate LED screen strictly according to Switching sequence! Don’t pluck the plugs in charged directly when the screen is working.2.Use a dedicated computer for controlling the screen, do not install any uncorrelated software to avoid invading of internet virus.
  • 详细介绍: Switching sequence (Synchronous system)(1)Starting up: turn on led screen first, start the computer, click the LED control panel, enter the display software, open the file, run the program. At last, turn on the dedicated control switch to provide power for screen.(2)Shutdown: turn off the dedicated control switch first , sign out the software and all programs ,turn off the computer ,shut down the screen at last.Precautions:1.Operate LED screen strictly according to Switching sequence! Don’t pluck the plugs in charged directly when the screen is working.2.Use a dedicated computer for controlling the screen, do not install any uncorrelated software to avoid invading of internet virus.
  • 详细介绍: Switching sequence (Synchronous system)(1)Starting up: turn on led screen first, start the computer, click the LED control panel, enter the display software, open the file, run the program. At last, turn on the dedicated control switch to provide power for screen.(2)Shutdown: turn off the dedicated control switch first , sign out the software and all programs ,turn off the computer ,shut down the screen at last.Precautions:1.Operate LED screen strictly according to Switching sequence! Don’t pluck the plugs in charged directly when the screen is working.2.Use a dedicated computer for controlling the screen, do not install any uncorrelated software to avoid invading of internet virus.
此处为可编辑区